Shayera Energy / National Operations Center

In Partnership with the U.S. Department of Energy Live telemetry

Compliance posture

FedRAMP High

Authorization active · P-ATO renewed 2026-04-11

Compliant

Zero-Trust Architecture

NIST SP 800-207 · continuous identity verification

Enforced

NERC CIP

Critical infrastructure protection controls

Compliant

FIPS 140-3 Encryption

AES-256 at rest · TLS 1.3 in transit

Validated

SOC 2 Type II

Independent audit period ending 2026-06-30

In Review

Zero-Trust telemetry

Verified identities
4,212
Denied requests (24h)
37
Token rotation
Every 15 min
Enclave attestation
Passing
Critical findings
0

National emergency override

Grants the Department of Energy priority routing of network capacity to critical infrastructure corridors.

Standby

Live audit log

EventTime (UTC)ActorAction
AUD-918210:42:19ZAI-ORCHESTRATORRebalanced 118 MW from SHY-005 to SHY-006
AUD-918110:38:04Zd.freitas@doe.govViewed compliance attestation package
AUD-918010:31:55ZSYSTEMZero-Trust token rotation completed (4,212 identities)
AUD-917910:22:41ZAI-ORCHESTRATORHigh-load advisory raised for SHY-012 Sunbelt Terminal
AUD-917810:14:07Zgrid.ops@shayera.govMaintenance window scheduled: SHY-008
AUD-917709:58:33ZSYSTEMFedRAMP continuous monitoring scan: 0 critical findings
AUD-917609:47:12ZAI-ORCHESTRATORPredictive maintenance flag on inverter bank B-14